Close
Cart (0)
Login
Staff Login
Register
FR
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Jack McMullar crew driving piler, Taber B1 bridge between 36 and 31-24-28-W4, Secondary B canal, Alberta.
Jack McMullar crew driving piler, Taber B1 bridge between 36 and 31-24-28-W4, Secondary B canal, Alberta.
Actions
Zoom view
Loading details...
Add to Lightbox
Add to cart
Download
Get link
Conceptually similar
Completed McElroy bridge on B and C canal between 25 and 26-24-28- W4, Western Irrigation District, Alberta.
Construction concrete drop B1, Secondary B canal, Dalroy, SE 1/4 31-24-27-W4, Alberta.
Dragline cleaning silt from the north Gleichen canal, NE 1/4 2-23-22-W4, Alberta.
Department of Natural Resources excavator number 15 on Glenrose canal, NW 1/4 21-25-23-W4, Alberta.
Canadian Pacific Railway excavator number 2 on south Cluny canal, SW 1/4 3-22-21-W4, Alberta.
New bridge over Secondary A canal, SE 1/4 20-23-23-W4, Western Irrigation District, Alberta.
P and H dragline relining main canal at Ogden seepage, Ogden, Alberta.
Holdup gates, Secondary A canal, SW 1/4 31-23-27-W4, Langdon, Alberta.
Winona Break secondary canal, 24-26-24-W4, Alberta.
3 inch concrete lining in the north branch A canal, SE 1/4 14-24-24-W4, Western Irrigation District, Alberta.
P and H dragline deepening Secondary A canal, NE 33-22-27-W4, Western Irrigation District, Alberta.
Completed rock drop number 7A, Secondary A canal, Strathmore district, 4-24-25-W4, Alberta.
Completed Spurgeon bridge, NW 1/4 18-23-23-W4, Mewassin district, Western section, Secondary A canal, Alberta.
Rating station C canal measuring, Western Irrigation District, Alberta.
Laminated Arch ring bridge north B canal, SW 9-25-25-W4, Alberta.
New concrete drop number 12A, secondary A canal, Gleichen, SW 1/4 2-23-23-W4, Alberta.
Secondary A canal and bankgate at A. Johnston's, NE 1/4 12-24-25-W4, Western Irrigation District, Alberta.
Drop number 1 main canal, discharging 1400 feet per second, SE 1/4 A-24-28-W4, Alberta.
Calgary sector weir in coffer dam and stop log machine, Western section, Calgary area, Alberta.
New bridge over Secondary B canal and rock crib groynes, SE 1/4 12-25-27-W4, Inverlake area, Alberta.
Similar tones
Jack McMullar crew driving piler, Taber B1 bridge between 36 and 31-24-28-W4, Secondary B canal, Alberta.
Part of a series of photographs documenting the development of the Western Irrigation District.
Ask a Question
About this image
Date
1927-08-25
Creator
Western Irrigation District
Genre
Negatives
,
Photographs
Place
Alberta
Subject
Bridges
,
Canadian Pacific Railway--Irrigation
,
Irrigation
,
Irrigation--Canals and flumes
,
Irrigation--Equipment and supplies
,
Western Irrigation District
Archival Information
Repository
Glenbow Archives
Fonds/Collection
Western Irrigation District fonds
Reference code
CA ACU GBA F1906-S0013
Link to Finding Aid
https://searcharchives.ucalgary.ca/photographs-625
Unique identifier
CU145471
Legacy Identifier
nb-39-435
How can you use this image?
To attribute objects use the information in Attribution. Permitted uses are outlined in Usage Rights. Usage Restrictions can only be waived by the copyright holder.
Questions? Add to cart and make a request.
Copyright Status
Public domain
Usage Rights
Commercial
,
Education
,
Exhibition
,
Instruction
,
Private study
,
Publication
,
Remix and adapt
,
Research
Conditions of Use
https://libanswers.ucalgary.ca/faq/199047
Attribution
Attribution
"Jack McMullar crew driving piler, Taber B1 bridge between 36 and 31-24-28-W4, Secondary B canal, Alberta.", 1927-08-25, (CU145471) by Western Irrigation District. Courtesy of Collection, Libraries and Cultural Resources Digital Collections, University of Calgary.