Close
Cart (0)
Login
Staff Login
Register
FR
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
New bridge over Secondary B canal and rock crib groynes, SE 1/4 12-25-27-W4, Inverlake area, Alberta.
New bridge over Secondary B canal and rock crib groynes, SE 1/4 12-25-27-W4, Inverlake area, Alberta.
Actions
Zoom view
Loading details...
Add to Lightbox
Add to cart
Download
Get link
Conceptually similar
Lyalta drop, Secondary B canal, Inverlake district, NW 1/4 9-25-26, Alberta.
New bridge over Secondary A canal, SE 1/4 20-23-23-W4, Western Irrigation District, Alberta.
Rebuilt Inverlake flume, length 312', width 5.5', depth 4', in SE 1/4 12-25-27-W4, Alberta.
Construction concrete drop B1, Secondary B canal, Dalroy, SE 1/4 31-24-27-W4, Alberta.
Winona Break secondary canal, 24-26-24-W4, Alberta.
Layhold and concrete lining on Glenrose canal, NE 1/4 24-25-24-W4, Alberta.
New concrete drop number 12A, secondary A canal, Gleichen, SW 1/4 2-23-23-W4, Alberta.
2A spillway gates at mile 27, Secondary A canal, Cairnhill, SW 18-23-25-W4, Alberta.
Completed rock drop number 7A, Secondary A canal, Strathmore district, 4-24-25-W4, Alberta.
Holdup gates, Secondary A canal, SW 1/4 31-23-27-W4, Langdon, Alberta.
Flume and drop line in South B canal, 22-24-26-W4, Inverlake district, Alberta.
Laminated Arch ring bridge north B canal, SW 9-25-25-W4, Alberta.
Completed Spurgeon bridge, NW 1/4 18-23-23-W4, Mewassin district, Western section, Secondary A canal, Alberta.
Jack McMullar crew driving piler, Taber B1 bridge between 36 and 31-24-28-W4, Secondary B canal, Alberta.
Hold up gate and bank gate, Secondary A canal, SW 1/4 31-23-27-W4, Langdon, Alberta.
Completed McElroy bridge on B and C canal between 25 and 26-24-28- W4, Western Irrigation District, Alberta.
Secondary A canal and bankgate at A. Johnston's, NE 1/4 12-24-25-W4, Western Irrigation District, Alberta.
Washout at Underhay spillway, Rockyford district, SE 1/4 4-27-22-W4, Alberta
Rebuilt Freeman flume, NW 1/4 20-25-25-W4, Alberta.
Completed concrete gates 2A spillway, Secondary A canal, mile 27, SW 1/4 18-23-25-W4, Cairnhill, Alberta.
Similar tones
New bridge over Secondary B canal and rock crib groynes, SE 1/4 12-25-27-W4, Inverlake area, Alberta.
Part of a series of photographs documenting the development of the Western Irrigation District.
Ask a Question
About this image
Date
1927-08-02
Creator
Western Irrigation District
Genre
Negatives
,
Photographs
Place
Alberta
Subject
Canadian Pacific Railway--Irrigation
,
Irrigation
,
Irrigation--Canals and flumes
,
Western Irrigation District
Archival Information
Repository
Glenbow Archives
Fonds/Collection
Western Irrigation District fonds
Reference code
CA ACU GBA F1906-S0013
Link to Finding Aid
https://searcharchives.ucalgary.ca/photographs-625
Unique identifier
CU145398
Legacy Identifier
nb-39-425
How can you use this image?
To attribute objects use the information in Attribution. Permitted uses are outlined in Usage Rights. Usage Restrictions can only be waived by the copyright holder.
Questions? Add to cart and make a request.
Copyright Status
Public domain
Usage Rights
Commercial
,
Education
,
Exhibition
,
Instruction
,
Private study
,
Publication
,
Remix and adapt
,
Research
Conditions of Use
https://libanswers.ucalgary.ca/faq/199047
Attribution
Attribution
"New bridge over Secondary B canal and rock crib groynes, SE 1/4 12-25-27-W4, Inverlake area, Alberta.", 1927-08-02, (CU145398) by Western Irrigation District. Courtesy of Collection, Libraries and Cultural Resources Digital Collections, University of Calgary.