Close
Cart (0)
Login
Staff Login
Register
FR
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Library
/
Archives and Special Collections
/
Glenbow Archives
/
[Fonds] Imperial Oil Limited fonds
/
[Series] Photographs
/
[Subseries] Production - Western Canada and North West Territories
/
CHANGE FOLDER
Production assembly at Davis Petroleum #2 well, Turner Valley area, Alberta.
Production assembly at Davis Petroleum #2 well, Turner Valley area, Alberta.
Actions
Zoom view
Loading details...
Add to Lightbox
Add to cart
Conceptually similar
Production assembly at West Turner #1 well, Turner Valley area, Alberta.
Drilling rig and production assembly at Davis Petroleum #1 well, Turner Valley area, Alberta.
Drilling at Royalite #28 well, Turner Valley area, Alberta.
Drilling at Royalite #31 well, Turner Valley area, Alberta.
Separator and tanks at Royalite #28 well, Turner Valley area, Alberta.
Completed derrick at Royalite #31 well site, Turner Valley area, Alberta.
Building derrick at Royalite #32 well site, Turner Valley area, Alberta.
Rigging up Royalite #32 well, Turner Valley area, Alberta.
Building derrick at Royalite #31 well site, Turner Valley area, Alberta.
Making sump at Royalite #31 well site, Turner Valley area, Alberta.
Clearing Royalite #28 well after acidizing, Turner Valley area, Alberta.
Drilling at Royalite #28 well, Turner Valley area, Alberta.
Christmas tree and producing hook up at Sterling Pacific #5 well, Turner Valley area, Alberta.
Pouring foundation for derrick at Royalite #31 well site, Turner Valley area, Alberta.
Acidizing Royalite #28 well, Turner Valley area, Alberta.
Cementing casing at Royalite #30 well, Turner Valley area, Alberta.
Standby draw works and rotary table inside derrick at Royalite #31 or Royalite #32 well, Turner Valley area, Alberta.
Roughnecks cementing casing at Royalite #28 well, Turner Valley area, Alberta.
Thawing out ground by means of gas lines prepatory to digging cellar and mud sump at Royalite #31 well site, Turner Valley area, Alberta.
Christmas tree and producing hook up at Sterling Pacific #5 well, Turner Valley area, Alberta.
Similar tones
Production assembly at Davis Petroleum #2 well, Turner Valley area, Alberta.
From album titled 'History of Drilling At Turner Valley - Oil Well Photos by H. Pollard, Calgary.' Original negatives for the Harry Pollard collection are held by the Provincial Archives of Alberta. Davis Petroleum #2 was started April 9, 1937 and completed September 7, 1937. Note derricks in the picture and snow on the ground.
Ask a Question
About this image
Date
[ca. 1938]
Creator
Pollard, Harry
Genre
Photographs
Place
Alberta
Subject
Derricks
,
Oil wells
,
Petroleum industry and trade--Oil well drilling
,
Snow
,
Turner Valley area, Alberta--Industry
Archival Information
Fonds/Collection
Imperial Oil Limited fonds
Unique identifier
CU1554517
Legacy Identifier
ip-6d-2-32
How can you use this image?
To attribute objects use the information in Attribution. Permitted uses are outlined in Usage Rights. Usage Restrictions can only be waived by the copyright holder.
Questions? Add to cart and make a request.
Usage Rights
Education
,
Instruction
,
Private study
,
Research
Usage Restrictions
Commercial
,
Exhibition
,
Publication
,
Remix and adapt
Copyright Status
Unknown
Attribution
"Production assembly at Davis Petroleum #2 well, Turner Valley area, Alberta.", [ca. 1938], (CU1554517) by Pollard, Harry. Courtesy of Libraries and Cultural Resources Digital Collections, University of Calgary.
Unique identifier:
CU1554517
Legacy Identifier:
ip-6d-2-32
Type:
Glenbow
Size:
500px × 396px 100.47 KB